Chủ Nhật, 08/03/2020, 16:03 (GMT+7)
.

Chairman of the PPC Le Van Huong checks the salinity and drought in Ba Rai - Phu An project area

ABO - On March 3, Chairman of the Tien Giang People's Committee (PPC) Le Van Huong and the Agriculture sector checked the salinity and drought situation in Ba Rai - Phu An project area in Cai Lay district.

Comrade Le Van Huong inspects the drain in the Ba Rai - Phu An Project.
Comrade Le Van Huong inspects the water in the Ba Rai - Phu An project. Photo: ABO/S.N

At the checking point, the Agriculture official informed: The water source in the field of the Ba Rai - Phu An project currently is quite plentiful, the salinity ranges from 0.2 to 0.9 gam/litre. However, if the flood tide in the coming time does not bring water to the project, irrigating fruit trees will meet difficulty.

Chairman of the PPC Le Van Huong asked the Agriculture sector to closely monitor the situation of drought and salinity. If salinity is reduced and within permitted limits, it is taken immediately to the field. In addition, many saline areas leak into the sewers need to be overcome immediately.

By S.N – Translated by HUU CHI

.
.
.